4852-9626-000-029-026-296 to 4852-9626-000-029-096-295 | | Ghost Pine Wind Power Project | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 70,000 |
9963-2876-000-029-364-968 to 9963-2876-000-029-368-403 | | Tolko Slave Lake Biomass Offset Project | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 3,436 |
8085-5876-000-030-366-022 to 8085-5876-000-030-370-811 | | Bull Creek Wind Farm | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 4,790 |
8085-5876-000-030-370-812 to 8085-5876-000-030-392-993 | | Bull Creek Wind Farm | 2018 | Capital Power LP | Active | 2027-07-05 | 22,182 |
6796-8882-000-030-591-631 to 6796-8882-000-030-649-863 | | Refiner Plate Energy Savings Project | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 58,233 |
8598-9108-000-031-433-002 to 8598-9108-000-031-585-358 | | Carbon Credit Solutions Inc. Tillage Project #23 | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 152,357 |
4768-6896-000-031-939-659 to 4768-6896-000-031-987-581 | | Aggregated Waste Heat Recovery Offset Project | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 47,923 |
7767-7720-000-031-762-333 to 7767-7720-000-031-762-764 | | Conservation Cropping Pool 24 | 2018 | Capital Power LP | Removed | 2027-07-05 | 432 |
7767-7720-000-031-656-168 to 7767-7720-000-031-762-332 | | Conservation Cropping Pool 24 | 2018 | Capital Power LP | Pending Retirement | 2027-07-05 | 106,165 |
4768-6896-000-031-881-445 to 4768-6896-000-031-939-658 | | Aggregated Waste Heat Recovery Offset Project | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 58,214 |
8598-9108-000-031-403-168 to 8598-9108-000-031-433-001 | | Carbon Credit Solutions Inc. Tillage Project #23 | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 29,834 |
7312-5550-000-026-189-246 to 7312-5550-000-026-289-245 | | Orica Nitric Acid Plant 2 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 100,000 |
7312-5550-000-026-440-188 to 7312-5550-000-026-449-767 | | Orica Nitric Acid Plant 2 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 9,580 |
7312-5550-000-026-339-246 to 7312-5550-000-026-341-554 | | Orica Nitric Acid Plant 2 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 2,309 |
6796-8882-000-027-053-024 to 6796-8882-000-027-131-969 | | Refiner Plate Energy Savings Project | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 78,946 |
4768-6896-000-020-310-139 to 4768-6896-000-020-316-688 | | Aggregated Waste Heat Recovery Offset Project | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 6,550 |
0043-9907-000-024-610-925 to 0043-9907-000-024-628-758 | | Magrath Wind Power Project | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 17,834 |
0766-3464-000-024-774-927 to 0766-3464-000-024-793-204 | | Chin Chute Wind Power Project | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 18,278 |
9238-1983-000-025-414-103 to 9238-1983-000-025-427-048 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 12,946 |
9238-1983-000-025-233-536 to 9238-1983-000-025-283-900 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 50,365 |
9238-1983-000-025-283-901 to 9238-1983-000-025-321-535 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 37,635 |
9238-1983-000-025-207-566 to 9238-1983-000-025-207-913 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 348 |
8085-5876-000-025-493-125 to 8085-5876-000-025-502-008 | | Bull Creek Wind Farm | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 8,884 |
8085-5876-000-025-526-215 to 8085-5876-000-025-533-825 | | Bull Creek Wind Farm | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 7,611 |
8085-5876-000-025-534-110 to 8085-5876-000-025-534-449 | | Bull Creek Wind Farm | 2017 | Capital Power LP | Pending Retirement | 2026-07-05 | 340 |
2198-6458-000-020-316-894 to 2198-6458-000-020-334-468 | | Lethbridge Biogas Offset Project | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 17,575 |
9238-1983-000-020-596-810 to 9238-1983-000-020-609-581 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 12,772 |
9238-1983-000-020-629-959 to 9238-1983-000-020-629-960 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 2 |
8081-5902-000-021-992-297 to 8081-5902-000-022-031-651 | | Carbon Credit Solutions Inc. Tillage Project #24 | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 39,355 |
6796-8882-000-019-994-905 to 6796-8882-000-020-056-459 | | Refiner Plate Energy Savings Project | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 61,555 |
4768-6896-000-020-290-806 to 4768-6896-000-020-309-566 | | Aggregated Waste Heat Recovery Offset Project | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 18,761 |
8598-9108-000-031-385-359 to 8598-9108-000-031-403-167 | | Carbon Credit Solutions Inc. Tillage Project #23 | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 17,809 |
4768-6896-000-017-426-496 to 4768-6896-000-017-431-530 | | Aggregated Waste Heat Recovery Offset Project | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 5,035 |
4768-6896-000-018-483-732 to 4768-6896-000-018-507-663 | | Aggregated Waste Heat Recovery Offset Project | 2016 | Capital Power LP | Pending Retirement | 2022-07-05 | 23,932 |
8598-9108-000-017-548-280 to 8598-9108-000-017-624-313 | | Carbon Credit Solutions Inc. Tillage Project #23 | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 76,034 |
9069-1961-000-015-021-244 to 9069-1961-000-015-026-996 | | Carbon Credit Solutions Inc. Tillage Project #22 | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 5,753 |
5964-2680-000-015-631-295 to 5964-2680-000-015-683-605 | | Castle Rock Ridge 76MW Wind Project | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 52,311 |
9238-1983-000-016-029-477 to 9238-1983-000-016-033-082 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 3,606 |
6100-7651-000-017-244-019 to 6100-7651-000-017-314-302 | | Cargill High River Methane Capture Project | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 70,284 |
9470-8445-000-019-695-751 to 9470-8445-000-019-697-929 | | Carbon Credit Solutions Inc. Wind Project #1 | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 2,179 |
3443-5684-000-019-691-089 to 3443-5684-000-019-692-974 | | Carbon Credit Solutions Inc. Wind Project #2 | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 1,886 |
9317-3205-000-025-960-846 to 9317-3205-000-025-977-988 | | Carbon Credit Solutions Inc. Tillage Project #27 | 2015 | Capital Power LP | Pending Retirement | 2022-07-05 | 17,143 |
9470-8445-000-019-694-482 to 9470-8445-000-019-695-750 | | Carbon Credit Solutions Inc. Wind Project #1 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,269 |
3482-7976-000-018-118-631 to 3482-7976-000-018-119-218 | | CO2 Capture from Prentiss2 for EOR | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 588 |
3443-5684-000-019-690-605 to 3443-5684-000-019-691-088 | | Carbon Credit Solutions Inc. Wind Project #2 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 484 |
8598-9108-000-014-079-077 to 8598-9108-000-014-169-750 | | Carbon Credit Solutions Inc. Tillage Project #23 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 90,674 |
8524-7427-000-014-298-561 to 8524-7427-000-014-366-504 | | Slave Lake Pulp Energy Efficiency Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 67,944 |
6192-2129-000-011-443-019 to 6192-2129-000-011-477-284 | | Carbon Credit Solutions Inc. Tillage Project #21 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 34,266 |
6192-2129-000-011-477-285 to 6192-2129-000-011-480-934 | | Carbon Credit Solutions Inc. Tillage Project #21 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 3,650 |
6192-2129-000-011-480-935 to 6192-2129-000-011-515-409 | | Carbon Credit Solutions Inc. Tillage Project #21 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 34,475 |
9238-1983-000-011-566-507 to 9238-1983-000-011-616-288 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 49,782 |
9238-1983-000-011-616-289 to 9238-1983-000-011-616-290 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 2 |
9238-1983-000-011-706-798 to 9238-1983-000-011-758-868 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 52,071 |
9238-1983-000-011-916-305 to 9238-1983-000-011-931-605 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 15,301 |
9238-1983-000-011-931-606 to 9238-1983-000-011-933-288 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,683 |
7312-5550-000-011-933-375 to 7312-5550-000-012-063-210 | | Orica Nitric Acid Plant 2 - Nitrous Oxide Abatement from Nitric Acid Production | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 129,836 |
9327-1871-000-012-478-732 to 9327-1871-000-012-495-890 | | Cargill High River Fluidized Bed Boiler Offset Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 17,159 |
7342-8764-000-012-836-337 to 7342-8764-000-012-841-357 | | AltaGas Bantry Acid Gas Injection Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 5,021 |
7342-8764-000-012-841-358 to 7342-8764-000-012-866-977 | | AltaGas Bantry Acid Gas Injection Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 25,620 |
6100-7651-000-012-943-979 to 6100-7651-000-012-966-657 | | Cargill High River Methane Capture Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 22,679 |
8047-4011-000-013-210-913 to 8047-4011-000-013-220-159 | | Edmonton Composting Facility | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 9,247 |
2768-2935-000-013-403-382 to 2768-2935-000-013-441-463 | | Conservation Cropping Pool 14 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 38,082 |
9069-1961-000-013-441-464 to 9069-1961-000-013-488-728 | | Carbon Credit Solutions Inc. Tillage Project #22 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 47,265 |
9069-1961-000-013-488-729 to 9069-1961-000-013-516-476 | | Carbon Credit Solutions Inc. Tillage Project #22 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 27,748 |
7635-3949-000-013-623-796 to 7635-3949-000-013-673-795 | | Soderglen Windfarm Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 50,000 |
7635-3949-000-013-693-155 to 7635-3949-000-013-727-141 | | Soderglen Windfarm Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 33,987 |
7635-3949-000-013-727-142 to 7635-3949-000-013-728-703 | | Soderglen Windfarm Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,562 |
5371-8051-000-013-728-704 to 5371-8051-000-013-800-611 | | Conservation Cropping Pool 15 | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 71,908 |
4125-3966-000-009-907-727 to 4125-3966-000-009-973-390 | | Blue Trail Wind Farm Offset Project | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 65,664 |
3863-7255-000-009-973-391 to 3863-7255-000-009-980-020 | | Ardenville Wind Farm Offset Project | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 6,630 |
7758-5940-000-010-050-021 to 7758-5940-000-010-097-464 | | Summerview and Waterton South Wind Farms Offset Project | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 47,444 |
6866-4768-000-010-097-465 to 6866-4768-000-010-100-069 | | Macleod Flats Wind Turbine Offset Project | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 2,605 |
6384-3449-000-010-304-707 to 6384-3449-000-010-365-420 | | Summerview II Wind Farm Offset Project | 2014 | Capital Power LP | Retired for Compliance | 2021-07-05 | 60,714 |
4852-9626-000-010-601-883 to 4852-9626-000-010-677-682 | | Ghost Pine Wind Power Project | 2014 | Capital Power LP | Pending Retirement | 2021-07-05 | 75,800 |
4593-7854-000-010-714-506 to 4593-7854-000-010-714-607 | | CO2 Capture from Prentiss1&2 for EOR | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 102 |
4593-7854-000-010-714-608 to 4593-7854-000-010-715-968 | | CO2 Capture from Prentiss1&2 for EOR | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,361 |
4593-7854-000-010-717-473 to 4593-7854-000-010-717-618 | | CO2 Capture from Prentiss1&2 for EOR | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 146 |
2255-1579-000-011-170-109 to 2255-1579-000-011-173-503 | | Canfor Grande Prairie Sawmill Biomass Energy Project | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 3,395 |
2959-5549-000-007-927-484 to 2959-5549-000-007-952-731 | | Bonavista Acid Gas Injection at South Rosevear | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 25,248 |
0043-9907-000-008-002-399 to 0043-9907-000-008-006-514 | | Magrath Wind Power Project | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,116 |
9238-1983-000-008-390-228 to 9238-1983-000-008-400-365 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 10,138 |
9238-1983-000-008-493-866 to 9238-1983-000-008-539-540 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 45,675 |
8047-4011-000-008-634-413 to 8047-4011-000-008-682-349 | | Edmonton Composting Facility | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 47,937 |
8047-4011-000-008-575-001 to 8047-4011-000-008-575-453 | | Edmonton Composting Facility | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 453 |
8047-4011-000-009-239-713 to 8047-4011-000-009-243-313 | | Edmonton Composting Facility | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 3,601 |
7635-3949-000-009-243-314 to 7635-3949-000-009-382-384 | | Soderglen Windfarm Project | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 139,071 |
9327-1871-000-012-448-724 to 9327-1871-000-012-462-344 | | Cargill High River Fluidized Bed Boiler Offset Project | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 13,621 |
5964-2680-000-007-186-788 to 5964-2680-000-007-327-529 | | Castle Rock Ridge 76MW Wind Project | 2013 | Capital Power LP | Pending Retirement | 2021-07-05 | 140,742 |
2959-5549-000-007-780-681 to 2959-5549-000-007-869-735 | | Bonavista Acid Gas Injection at South Rosevear | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 89,055 |
0043-9907-000-003-318-133 to 0043-9907-000-003-338-680 | | Magrath Wind Power Project | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 20,548 |
9238-1983-000-003-805-275 to 9238-1983-000-003-905-274 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 100,000 |
7635-3949-000-005-167-260 to 7635-3949-000-005-248-084 | | Soderglen Windfarm Project | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 80,825 |
5345-7771-000-005-794-285 to 5345-7771-000-005-923-010 | | Forest Harvesting Direct GHG Reduction | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 128,726 |
4593-7854-000-006-704-576 to 4593-7854-000-006-712-209 | | CO2 Capture from Prentiss1&2 for EOR | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 7,634 |
4593-7854-000-006-724-125 to 4593-7854-000-006-743-619 | | CO2 Capture from Prentiss1&2 for EOR | 2012 | Capital Power LP | Pending Retirement | 2021-07-05 | 19,495 |
3863-7255-000-000-100-935 to 3863-7255-000-000-143-953 | | Ardenville Wind Farm Offset Project | 2011 | Capital Power LP | Retired for Compliance | 2021-07-05 | 43,019 |
4125-3966-000-000-130-793 to 4125-3966-000-000-167-045 | | Blue Trail Wind Farm Offset Project | 2011 | Capital Power LP | Retired for Compliance | 2021-07-05 | 36,253 |
6866-4768-000-000-031-612 to 6866-4768-000-000-032-898 | | Macleod Flats Wind Turbine Offset Project | 2011 | Capital Power LP | Retired for Compliance | 2021-07-05 | 1,287 |
0043-9907-000-000-386-844 to 0043-9907-000-000-409-601 | | Magrath Wind Power Project | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 22,758 |
0982-9700-000-000-927-196 to 0982-9700-000-000-931-195 | | Reduced and Zero Tillage Management Pool 7 | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,000 |
9238-1983-000-001-194-318 to 9238-1983-000-001-244-317 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 50,000 |
9238-1983-000-001-144-318 to 9238-1983-000-001-194-317 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 50,000 |
7635-3949-000-000-701-717 to 7635-3949-000-000-729-519 | | Soderglen Windfarm Project | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 27,803 |
2886-1597-000-013-906-406 to 2886-1597-000-013-914-969 | | Red Deer Ethanol Production Expansion Project | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 8,564 |
4593-7854-000-002-366-757 to 4593-7854-000-002-468-274 | | CO2 Capture from Prentiss1&2 for EOR | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 101,518 |
3482-7976-000-002-660-882 to 3482-7976-000-002-722-738 | | CO2 Capture from Prentiss2 for EOR | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 61,857 |
9163-7693-000-000-027-363 to 9163-7693-000-000-031-720 | | Joffre Viking CO2 Injection Project | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,358 |
9421-3132-000-001-747-668 to 9421-3132-000-001-753-023 | | Carbon Reduction Offset Project - Series 12 | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 5,356 |
5345-7771-000-001-913-371 to 5345-7771-000-002-049-784 | | Forest Harvesting Direct GHG Reduction | 2011 | Capital Power LP | Pending Retirement | 2021-07-05 | 136,414 |
9163-7693-000-000-031-721 to 9163-7693-000-000-035-884 | | Joffre Viking CO2 Injection Project | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,164 |
4680-7897-000-000-017-086 to 4680-7897-000-000-029-055 | | South Swan Hills CO2 Injection Project | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 11,970 |
0153-2942-000-000-069-297 to 0153-2942-000-000-075-435 | | Carbon Reduction Offset Project - Series 8 | 2010 | Capital Power LP | Retired for Compliance | 2021-07-05 | 6,139 |
1991-0013-000-000-084-884 to 1991-0013-000-000-085-434 | | Carbon Credit Solutions Inc. Tillage Project #9 | 2010 | Capital Power LP | Retired for Compliance | 2021-07-05 | 551 |
5345-7771-000-000-421-044 to 5345-7771-000-000-530-005 | | Forest Harvesting Direct GHG Reduction | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 108,962 |
2886-1597-000-000-000-001 to 2886-1597-000-000-000-146 | | Red Deer Ethanol Production Expansion Project | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 146 |
2886-1597-000-000-000-147 to 2886-1597-000-000-012-941 | | Red Deer Ethanol Production Expansion Project | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 12,795 |
3482-7976-000-000-290-340 to 3482-7976-000-000-316-709 | | CO2 Capture from Prentiss2 for EOR | 2010 | Capital Power LP | Pending Retirement | 2021-07-05 | 26,370 |
2886-1597-000-000-045-446 to 2886-1597-000-000-050-008 | | Red Deer Ethanol Production Expansion Project | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,563 |
9153-0434-000-000-005-625 to 9153-0434-000-000-009-770 | | Highmark Renewables Integrated Manure Utilization System | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 4,146 |
4086-8084-000-000-567-605 to 4086-8084-000-000-603-360 | | Viterra's Tillage Management Offset Project - Series 13 | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 35,756 |
4086-8084-000-000-603-361 to 4086-8084-000-000-604-715 | | Viterra's Tillage Management Offset Project - Series 13 | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,355 |
8193-7446-000-000-039-279 to 8193-7446-000-000-039-378 | | Carbon Reduction Offset Project - Series 9 | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 100 |
3671-9829-000-000-116-245 to 3671-9829-000-000-123-594 | | Carbon Reduction Offset Project - Series 6 | 2009 | Capital Power LP | Retired for Compliance | 2021-07-05 | 7,350 |
9238-1983-000-000-628-727 to 9238-1983-000-000-630-638 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2009 | Capital Power LP | Retired | 2021-07-05 | 1,912 |
5149-1613-000-000-143-049 to 5149-1613-000-000-144-548 | | Carbon Reduction Offset Project - Series 7 | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,500 |
5149-1613-000-000-145-382 to 5149-1613-000-000-146-135 | | Carbon Reduction Offset Project - Series 7 | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 754 |
4680-7897-000-000-000-001 to 4680-7897-000-000-009-810 | | South Swan Hills CO2 Injection Project | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 9,810 |
9163-7693-000-000-020-869 to 9163-7693-000-000-027-362 | | Joffre Viking CO2 Injection Project | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 6,494 |
1285-6512-000-000-017-026 to 1285-6512-000-000-030-179 | | Pembina CO2 Injection Project | 2009 | Capital Power LP | Pending Retirement | 2021-07-05 | 13,154 |
4680-7897-000-000-009-811 to 4680-7897-000-000-017-085 | | South Swan Hills CO2 Injection Project | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 7,275 |
9163-7693-000-000-011-470 to 9163-7693-000-000-020-868 | | Joffre Viking CO2 Injection Project | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 9,399 |
1285-6512-000-000-042-602 to 1285-6512-000-000-050-145 | | Pembina CO2 Injection Project | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 7,544 |
1717-3741-000-000-712-598 to 1717-3741-000-000-715-154 | | Clover Bar Landfill Gas Generating Station | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 2,557 |
9238-1983-000-000-273-763 to 9238-1983-000-000-276-411 | | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | 2008 | Capital Power LP | Retired | 2021-07-05 | 2,649 |
3671-9829-000-000-096-691 to 3671-9829-000-000-115-486 | | Carbon Reduction Offset Project - Series 6 | 2008 | Capital Power LP | Retired for Compliance | 2021-07-05 | 18,796 |
4086-8084-000-000-468-322 to 4086-8084-000-000-565-254 | | Viterra's Tillage Management Offset Project - Series 13 | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 96,933 |
9153-0434-000-000-001-957 to 9153-0434-000-000-005-624 | | Highmark Renewables Integrated Manure Utilization System | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 3,668 |
8323-4626-000-000-273-271 to 8323-4626-000-000-275-046 | | Carbon Reduction Offset Project - Series 11 | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,776 |
2886-1597-000-000-026-671 to 2886-1597-000-000-034-181 | | Red Deer Ethanol Production Expansion Project | 2008 | Capital Power LP | Pending Retirement | 2021-07-05 | 7,511 |
2886-1597-000-000-017-154 to 2886-1597-000-000-019-989 | | Red Deer Ethanol Production Expansion Project | 2007 | Capital Power LP | Retired for Compliance | 2021-07-05 | 2,836 |
8323-4626-000-000-169-923 to 8323-4626-000-000-171-949 | | Carbon Reduction Offset Project - Series 11 | 2007 | Capital Power LP | Retired for Compliance | 2021-07-05 | 2,027 |
9163-7693-000-000-000-001 to 9163-7693-000-000-011-469 | | Joffre Viking CO2 Injection Project | 2007 | Capital Power LP | Pending Retirement | 2021-07-05 | 11,469 |
9153-0434-000-000-000-442 to 9153-0434-000-000-001-956 | | Highmark Renewables Integrated Manure Utilization System | 2007 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,515 |
4086-8084-000-000-382-236 to 4086-8084-000-000-466-001 | | Viterra's Tillage Management Offset Project - Series 13 | 2007 | Capital Power LP | Pending Retirement | 2021-07-05 | 83,766 |
3671-9829-000-000-078-026 to 3671-9829-000-000-095-682 | | Carbon Reduction Offset Project - Series 6 | 2007 | Capital Power LP | Retired for Compliance | 2021-07-05 | 17,657 |
1285-6512-000-000-050-146 to 1285-6512-000-000-056-749 | | Pembina CO2 Injection Project | 2007 | Capital Power LP | Pending Retirement | 2021-07-05 | 6,604 |
9153-0434-000-000-000-001 to 9153-0434-000-000-000-441 | | Highmark Renewables Integrated Manure Utilization System | 2006 | Capital Power LP | Pending Retirement | 2021-07-05 | 441 |
2886-1597-000-000-051-326 to 2886-1597-000-000-054-363 | | Red Deer Ethanol Production Expansion Project | 2006 | Capital Power LP | Retired for Compliance | 2021-07-05 | 3,038 |
9163-7693-000-000-038-794 to 9163-7693-000-000-039-566 | | Joffre Viking CO2 Injection Project | 2006 | Capital Power LP | Pending Retirement | 2021-07-05 | 773 |
3877-1697-000-000-215-403 to 3877-1697-000-000-245-402 | | Verdant Energy Limited - Dapp Power Electric Generation Facility | 2006 | Capital Power LP | Retired | 2021-07-05 | 30,000 |
3671-9829-000-000-065-107 to 3671-9829-000-000-077-667 | | Carbon Reduction Offset Project - Series 6 | 2006 | Capital Power LP | Retired for Compliance | 2021-07-05 | 12,561 |
1285-6512-000-000-000-001 to 1285-6512-000-000-017-025 | | Pembina CO2 Injection Project | 2006 | Capital Power LP | Pending Retirement | 2021-07-05 | 17,025 |
1285-6512-000-000-030-180 to 1285-6512-000-000-042-601 | | Pembina CO2 Injection Project | 2005 | Capital Power LP | Pending Retirement | 2021-07-05 | 12,422 |
9163-7693-000-000-035-885 to 9163-7693-000-000-037-305 | | Joffre Viking CO2 Injection Project | 2005 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,421 |
4086-8084-000-000-288-095 to 4086-8084-000-000-290-062 | | Viterra's Tillage Management Offset Project - Series 13 | 2005 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,968 |
6570-5350-000-000-050-720 to 6570-5350-000-000-051-753 | | Carbon Reduction Offset Project - Series 10 | 2005 | Capital Power LP | Retired for Compliance | 2021-07-05 | 1,034 |
2886-1597-000-000-023-476 to 2886-1597-000-000-026-097 | | Red Deer Ethanol Production Expansion Project | 2005 | Capital Power LP | Retired for Compliance | 2021-07-05 | 2,622 |
2886-1597-000-000-035-024 to 2886-1597-000-000-036-505 | | Red Deer Ethanol Production Expansion Project | 2004 | Capital Power LP | Retired for Compliance | 2021-07-05 | 1,482 |
9163-7693-000-000-037-306 to 9163-7693-000-000-038-793 | | Joffre Viking CO2 Injection Project | 2004 | Capital Power LP | Pending Retirement | 2021-07-05 | 1,488 |
6570-5350-000-000-058-379 to 6570-5350-000-000-059-914 | | Carbon Reduction Offset Project - Series 10 | 2003 | Capital Power LP | Retired for Compliance | 2021-07-05 | 1,536 |
6570-5350-000-000-001-828 to 6570-5350-000-000-005-354 | | Carbon Reduction Offset Project - Series 10 | 2002 | Capital Power LP | Retired for Compliance | 2021-07-05 | 3,527 |
8323-4626-000-000-000-001 to 8323-4626-000-000-003-012 | | Carbon Reduction Offset Project - Series 11 | 2002 | Capital Power LP | Retired for Compliance | 2021-07-05 | 3,012 |
9891-3283-000-000-000-001 to 9891-3283-000-000-005-550 | | Carbon Credit Solutions Inc. Tillage Project #5 | 2002 | Capital Power LP | Retired | 2021-07-05 | 5,550 |