Buffalo Plains Wind Farm
9441-0121
The Project is a wind farm with 83 Siemens Gamesa turbines, associated infrastructure (i.e., underground collector system, road upgrades); and a substation. The overall capacity of the Project is 494.6 MW. The site consists of approximately 17,500 acres. The Project Site is generally flat to gently rolling terrain with historically agricultural land use. The expected lifetime of the Project is 25 years.
Wind-Powered Electricity Generation
None defined
None defined
Armada, AB T0L 1G0, Canada
T0L 1G0
The following is a Google Maps feature that may not be accessible for all users. For assistance with location information, please contact: ghgregistries@csagroup.org
2024-09-06
2024-09-06
2034-09-05
Active
2
5,425,579
None Defined
Emission Offsets Summary
0
Active
0
Pending Retirement
0
Retired
0
Total 
Emission Offsets
Serial RangesType
Vintage
Year
Current Company NameEmission Offset Status
Expiry Date
Total 
(t CO2 e)
There are no emission offsets for this project that have been serialized. Please contact the project developer or authorized project contact.